Proton Group, LLC
Proton Group, LLC
  • Home
  • Services
  • About
  • Contact
  • More
    • Home
    • Services
    • About
    • Contact
Project Consultation
  • Home
  • Services
  • About
  • Contact
Project Consultation

EV Charging Infrastructure Services

FROM THE POLE TO THE PLUG

  One Partner. Every Phase of Your Project. 


From site assessment and utility coordination through engineering, permitting, construction, charger installation and commissioning, Proton Group helps coordinate the complete infrastructure required to get your vehicles charging. 

PLANNING & SITE ASSESSMENT

Every successful EV charging project starts with understanding the site, the vehicles and how the charging system will actually be used.


Proton Group evaluates your existing electrical infrastructure, charging requirements, vehicle needs and future expansion plans to help develop a practical path forward. Our goal is to identify potential challenges early, determine the appropriate charging approach and establish a clear project scope before major costs are incurred.


Services may include:

  • Site surveys and preliminary feasibility assessments 
  • Existing electrical infrastructure review 
  • Utility service and available capacity evaluation 
  • Vehicle and fleet charging requirement analysis 
  • Charger quantity and power-level recommendations 
  • Charger location and equipment layout planning 
  • Vehicle-to-charger compatibility review 
  • Preliminary load and demand evaluation 
  • Future fleet growth and expansion planning 
  • Preliminary project scope and budget development 


From a single charging station to a larger fleet deployment, proper planning helps ensure the infrastructure is designed around the way your organization actually operates.

UTILITY, ENGINEERING & PERMITTING

EV charging infrastructure can add significant electrical demand to a property. Understanding the available electrical capacity and determining how the required power will be delivered are critical steps in developing a successful project.


Proton Group coordinates with utilities, engineers, local authorities and project stakeholders to develop the electrical infrastructure required for your charging system. From existing-service evaluations to new utility services and upgrades, we help move the project through design, utility review and permitting so it is ready for construction.


Services may include:

  • Utility service and capacity coordination 
  • New electrical service and service-upgrade planning 
  • Utility applications and project meetings 
  • Transformer and electrical-service coordination 
  • Electrical distribution and infrastructure planning 
  • Load calculations and electrical capacity analysis 
  • Coordination of engineered construction drawings 
  • Site plans and electrical one-line diagrams 
  • Charger and electrical equipment layout development 
  • Permit application and submission coordination 
  • Coordination with local Authorities Having Jurisdiction (AHJs) 
  • Responses to utility, engineering and permit-review comments


By coordinating the utility, engineering and permitting requirements early in the process, we help identify potential obstacles, reduce delays and keep the project moving toward construction. 

INSTALLATION & COMMISSIONING

Selecting the right EV charger is only part of the project. The equipment must also match the vehicles, available electrical capacity, charging schedule, network requirements and long-term operating needs of the site.


Proton Group is charger-agnostic, allowing us to evaluate and coordinate equipment based on the specific needs of each project rather than being limited to a single manufacturer. We support Level 2 AC charging, DC fast charging and larger fleet charging applications, along with the electrical and civil infrastructure required to support them.


Services may include:

  • EV charger selection and specification review 
  • Vehicle-to-charger compatibility review 
  • Level 2 AC charging systems 
  • DC fast charging systems 
  • Single-port and multi-port charging configurations 
  • Networked and OCPP-capable charging solutions 
  • Equipment procurement and delivery coordination 
  • Electrical infrastructure installation coordination 
  • Trenching, conduit and underground distribution 
  • Concrete equipment pads and charger foundations 
  • Protective bollards and site protection 
  • Charger installation and final electrical connections 
  • Network configuration and charger activation 
  • Equipment startup, testing and commissioning 
  • Owner and operator training


Our goal is to deliver a complete charging system that is properly installed, tested, commissioned and ready to support your vehicles from day one. 

INCENTIVES, GRANTS & FUNDING SUPPORT

EV charging projects may qualify for state, utility, municipal or other incentive and grant programs that can significantly reduce the overall cost of charging equipment and infrastructure.


Proton Group helps clients identify potential funding opportunities, understand program requirements and coordinate the documentation needed throughout the application and reimbursement process. Because every program has different eligibility rules, deadlines and documentation requirements, we work to evaluate available opportunities early in the project so funding requirements can be incorporated into the overall plan.


Services may include:

  • Incentive & Grant Identification 
  • Preliminary program and project eligibility review 
  • Incentive and grant application assistance 
  • Required project documentation preparation 
  • Equipment and project-cost documentation 
  • Utility and program administrator coordination 
  • Contractor and vendor documentation coordination 
  • Prevailing Wage & Compliance Coordination 
  • Pre-installation documentation and approvals 
  • Post-installation documentation 
  • Project closeout assistance 
  • Reimbursement documentation and submission support


Our goal is to help clients maximize available funding opportunities while keeping the charging project aligned with applicable program requirements from planning through completion. 

MAINTENANCE, WARRANTY & ONGOING SUPPORT

EV charging infrastructure is a long-term investment, and keeping the equipment operating reliably is just as important as getting it installed.


Proton Group provides ongoing support after commissioning to help clients maintain their charging systems, address equipment issues and coordinate service when problems arise. We work with charger manufacturers, network providers and qualified service technicians to help keep charging infrastructure operational and minimize unnecessary downtime.


Services may include:

  • Preventive maintenance coordination 
  • Charger troubleshooting and diagnostics 
  • Network and communications support 
  • Manufacturer technical support coordination 
  • Warranty claim assistance 
  • Replacement parts coordination 
  • Repair and field service coordination 
  • Charger configuration and settings assistance 
  • Software and network support coordination 
  • Owner and operator training 
  • System performance review 
  • Future expansion planning


Our goal is to provide a long-term resource for your EV charging infrastructure—not simply install the equipment and walk away. 

READY TO START YOUR EV CHARGING PROJECT?

Let’s Build the Right Charging Solution for Your Organization.


Every site, fleet and electrical system is different. Proton Group can help evaluate your needs and develop a practical path from initial planning through installation and long-term operation.

PROJECT CONSULTATION
  • Home
  • Services
  • About
  • Contact

Driving Innovation. Delivering Results.

Copyright © 2026 Proton Group, LLC. All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept